168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical modifications taking place on 12th floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Addition of new split system air conditioner, including associated ductwork,piping, and controls to unit 801-2.
General construction taking place on 12th fl per plans filed herewith. no change in use, egress, or occupancy.
Hereby filing for the replacment and installation of plumbing fixtures. no change to use occupancy or egress.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Remove existing staircase and install new update toilets. remove non-bearing partitions create new 3 x 7 door in storefront. misc. painting and repairs throughout. pl filed under l…
Structural framing and reinforcements on floors Cellar, Mez, 1-12 and Roof as per plans filed herewith.
Mechanical work on 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of awning, flag and interior signage, approx. 100 SF as per drawings herein.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Remove a convenience stair from the cellar level to the second floor and infill floor openings, Remove soffits and replace ceilings at select locations, Replace doors at select loc…
Interior renovation of the 18th & 19th floor as per plans filed. no change to use, egress or occupancy.
Support for new ada lift from 1st to 2nd floor. no change to use, egress or occupancy
Sprinkler modifications as per submitted drawings. No change to use, egress or occupancy
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or the sidewalk shed is front of the building at 5 avenue elevation.
Renovate existing building. construct rear horizontal addition at basement and 1st floor. convert from class-b multiple dwelling to two family residence. demo and construct partiti…
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is front of the building, backyard and courtyard.
Hereby filing for the interior renovation of apartment 5j located on the 5th floor. no change to use, egress or occupancy.
Reconnect existing low pressure gas line and remove gas booster. no change in means of egress use group or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…