168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior renovation of apartment 2b, 3c, 4b, 4c, 5c. partition changes to non-load-bearing walls as per plans. no change in use, occupancy or egress.
Support of excavation plans for test pits at the existing courtyard to address nyc dob violation#vio25-02130 and ecb viol # 39160121m
Interior garage repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
install condensing units at windows, air handlers, ductwork, no change to use, exits or occupancy
Filing Mechanical Equipment Use On Grade In Conjunction With Full Mechanical Demolition Phase job number M01340535-I1
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Replace existing hvac units as per plans. no change in use, occupancy, or egress.
Interior renovation of apartment space with replacement, relocation, and additional plumbing fixtures. no change of use, egress, or occupancy under this application
Plumbing works as shown in plans at apt 15l & 15k on the 15th floor. no change in egress, occupancy or use.
Renovation of an existing apartment# 4E on the fourth floor. work includes non-structural demolition and general construction as per plans filed herewith. No change to use. egress…
Removal and installation of new sprinkler heads as per plans filed herewith. no change to use, egress or occupancy
Filing application for combination of apartment 4f/4g. work includes interior renovations of 4f kitchen and bathroom only, replacing plumbing fixtures, appliances, and cabinetry, a…
Removal of existing mechanical systems, grilles and diffusers in the pantry and 7th floor bathrooms. installation of new air-cooled split heat pump units for the pantry. installati…
Replacement of existing kitchen millwork andappliances, new powder room, installation of new plumbingfixtures on existing rough-ins,
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
1st floor and cellar interior renovation. Install plumbing fixtures. No change in use, occupancy, or egress under this application.
Remove & replace existing plumbing fixtures with new at apt. 18l as per plans filed herewith. no change in egress, zoning, occupancy, & use.
New front door installation and partial removal of facaded masonry as per plans filed herewith. no change to use, egress, or occupancy.
Architectural modifications taking place on the 12th and 13th floors as per plans filed herewith. No change in use, egress or occupancy.
mechaniacal work associated with the townhouse renovation as shown on plans filed herewith. no change to use, egress or occupancy