168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed residential conversion of an existing 12-storey commercial building to mix-use commercial and residential use. No change in bulk or floor area.
Coordination of plumbing systems with new plumbing fixtures in the renovated areas of the first, second and third floors.
Installation of suspended scaffold for facade inspection/repair.
Plumbing work filed in conjunction with GC application for bathroom renovation
Installation of new temporary core sprinkler protection system inaccordance with buildings bulletin 2020-012.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Plumbing work on 27th floor as indicated on plans filed herewith
Mechanical work as shown on plans filed herewith.
Subsequent Sprinkler System filing in conjunction with ALT-CO filing.
Modification to interior partions on the 1st floor. no change in use, egress or occupancy.
Proposed exterior facade repairs and associated work as per plans filed herewith. no change in use, egress or occupancy.
Interior renovation in apt 8l
Railing installation as per plans filed herewith. No change to use, egress, or occupancy.
Modifications to the existing plumbing system on the 8th floor (Infrastructure) as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code.
Installation of construction fence in accordance with nycc chapter 33. no change in egress, use, or occupancy.
Sidewalk shed proposed installation of sidewalk shed as per plan. no change in use,egress or occupancy.
Mod. of Verizon site. Remove 6 antennas, 4 RRHs, 1 dist. box, 8 braces, 3 MDBs, & 3 cabinets. Replace 5 antennas, 1 antenna w/2 stacked antennas, 4 RRHs, & 2 dist. boxes. Install 6…
Sprinkler work as shown on plans filed herewith.
Split apartments on 33rd floor. removing interior double-egress doors and installing two typical apartment fireproof entrance doors
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…