25,100 permits · NY · Manhattan
Interior renovation of apt. 10b on the 10th floor. no change to use, egress, or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Infill existing stair opening 150 sf. provide new ada-compliant ramp 300 sf. no change to use, egress or occupancy.
Interior renovation at apt. 14a on 014. minor partition workand plumbing work as per plan. plumbing work will be filed subsequently with this application. no change in use, egressor occupancy in this...
Proposed renovation of primary bathroom at first floor of exist. two story plus cellar condominium unit# 5 as indicated on plans. no changes to exist. use, occupancy, or egress.
Application filed for plumbing additions/modifications on the 14th fl as per plans filed herewith. no change in use, egress, or occupancy.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Plumbing work at cellar filed in conjunction with renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: installation of new booster pump and hot water heaters. no change...
Installation of temporary beta max hoist as per plans. no change in use, egress or occupancy.
alteration application to do interior fit-out of existing class A dwelling unit. No change to use Egress of Occupancy
Removal, replacement and installation of new plumbing fixtures and associated CW/sanitary piping on the 17-18th Floors as per plans (Lowenstein Sandler LLP - Office Renovations.) No change to use, egr...
Facade repairs as per plans filed. no change in use or egress under this application.
Installation of temporary supported scaffold as per plan. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Hereby filing to install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Raise height of existing north parapet wall to comply with code. remove ivy on exterior of north wall at the parapet level, replace bricks as necessary and repoint.
Filing herewith for installation of Washing Machine in Apartment 30AB
Interior illuminated non-advertising accessory sign - in property lines - kilwins. no change of use, egress or occupancy.
Interior renovation of existing apartment associated with the GC scope. The proposed scope includes the removal and installation of new partitions and doors. No change in use, egress, or occupancy.
Alteration and change of occupancy at 1-story nature center building.
Application filed for sprinkler additions/modifications on the 14th fl as per plans filed herewith. no change in use, egress, or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com