168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical work filed in conjunction with the renovation of an existing apartment. Architectural and plumbing work filed under separate applications. No change in use, occupancy or…
Install new gas piping and gas meter for replacement gas/oil burner on existing boiler as per plans. no change in use, egress or occupancy.
Modifications to the existing Sprinkler System: Remove (192) existing Sprinkler heads and Install (144) new Sprinkler heads on the 16th Floor as per plans (AHU Replacement.) No cha…
Structural work filed in conjunction of installation of an Elevator and rear extension slab.
Installation of temporary supported scaffold and construction fence/enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress an…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of a three personnel/material hoists. car1 shall be 7000# capacity. cars2&3 shall be 6000# capacity during new building const filed sep. hoists shall comply with the 2…
Interior renovation of existing commercial space with removal & installation of non-load-bearing partitions, new partitions,ceiling & finish work, & minor electrical work. No chang…
Installation of 300 psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under t…
Nyu-infrastructure mer - installation of hvac equipment including chillers, cooling towers, air handling units, air terminal units, etc., and installation of all associated ductwor…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Filing for mixed use residential building
Renovation apartment #gb existing 14 story building. demolition and construction work as per plan. install flooring, ceiling and painting throughout. no change in egress, use, or o…
General Construction & Mechanical related work in conjunction with Boiler Replacement. Modification to existing tank room to accommodate installation of new hot water heaters and n…
General Construction & Mechanical related work in conjunction with Boiler Replacement. Modification to existing tank room to accommodate installation of new hot water heaters and n…
Filing herewith drawings indicating modification of the Plumbing on the 21st floor construction (marketed as the 22nd floor). No change in use, egress, or occupancy under this appl…
Full demolition of one story field house and bleachers of Murry Bergtraum HS
Modification of existing sprinkler system
New sprinkler heads at existing rectory at 5th floor. connect to existing sprinkler riser.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola