Repair work at both garage levels and exterior ramp. select repair including brick replacement , mortar repointing,concrete patching,existing coating removal and new expansion join…
Floor repairs, New entry door and parlor windows
Construct new nine (9) story mixed use building as per plans filed herewith. Please assign this application to Development Hub. Please note that the Pre-development consultation oc…
Facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Installation of sprinklers at the cellar and roof, new 1-1/2 drain riser, and new 4 riser from 11th floor to roof as shown on plans filed herewith. no change in use (u.g.), occupan…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of sidewalk shed for pedestrian safety during construction. sidewalk shed shall comply with nycc 2022 chapter 33 . no change in egress, use, or occupancy.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the nyc building code 2022. no change in use, occupancy, or egress under this appl…
Installation of a temporarily heavy-duty sidewalk shed and material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/…
Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress u…
Minor interior renovation of apartment 7e. no change in use, egress, occupancy.
Proposed heating, cooling and ventilation systems, HVAX air distribution and ductwork layouts as per plan filed in conjunction with Alt-CO-GC # M00975056-I1.
Reinforcement of existing masonry bearing wall. no change in use, egress or occupancy.
FISP INSPECTION (Facade Inspec/on Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola