24,840 permits · NY · Manhattan
This alt gc application is being filed for the tenant fit-out of an existing retail space in a high rise office building. work includes new shuttle lula elevator and convenience stair, self levelling...
Renovation of the cellar level fitness, public restrooms, first floor lobby renovation and reception areas. no change in use, egress or occupancy.
Replacement of existing cooling tower. No change in use, egress, or occupancy proposed under this filing.
Structural work filed to install new steel lintels, masonry infill and slab repair.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Propose minor non-structural Interior renovation of existing Apartment 1E Only replace Cabinets and Bathroom floor. No change of use, egress or occupancy.
Installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Suspended scaffold outrigger system installation for facade repairs and inspections.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th fl as per plans filed herewith. no change in use, egress, or occupancy.
Removal of plumbing fixtures on the 17th floor as indicated on drawings.
Air conditioning units andinstallation of new packaged terminal ac units (ptac). installationof kitchen exhaust louver and motorized control valves forradiators. no change in use, occupancy or egress.
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Interior renovation to include demolition of existing and construction of new partitions. no change in use, egress, or occupancy.
Miscellaneous renovations in apartment 48D, 48th floor. Work to include non structural demolition, new ceilings, new flooring and finishes throughout. no change in use, egress nor occupancy.
Perform minor exterior demolition & construction inconjunction with penthouse a renovation. replace terrace doors, windows & pavers. modify existng masonry openings. install awning. install hvac scree...
Installation of a temporarily Plywood Enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application
Architectural demo scope only associated with the ROOF work at the New School. No change of use, egress or occupancy.
Interior partial-renovation to 6th floor unit # 620 - In conjunction with the OT # M01380366-I1 removal of two existing HVAC units to be replaced with in-kind units.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com