168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Plumbing work in conjunction with NB 121187820
At 9th floor apt 9e- interior renovation, removal and installation of non bearing interior partitions and related electrical work.
Sprinkler work to include - modification of existing sprinkler system, install new sprinkler heads. no change in use, egress or occupancy
Installation of sidewalk shed in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Installation of solar pv system. no change to use, egress, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.the sidewalk shed at adam clayton powell blvd in front of the building.
Plumbing work filed in conjunction with Alt-Co application
Plumbing work as indicated on the plans.
General construction for tenant fit out in cellar, 1st floor and mezzanine, as shown on plans filed herewith. No change in use, egress, or occupancy.
Demolition of sprinkler/standpipe system as shown.
Proposed plumbing work in conjunction to arch. designs, relocate pl fixtures, no change in use, egress and occupancy.
plumbing modifications taking place on the 16th fl construction/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
Sh/ps751m - for temporary construction equipment (emergency shed) submitting on behalf of contractor, related llw#141073 no change in use, occupancy or egress
Replacement of dual temperature riser piping inclusive of condensate drain piping. no change to use, egress, or occupancy.
Minor partition work in apts 1 & 2 with general carpentry. No change to use bulk or egress
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed interior renovation work for an existing restaurant on cellar, 1st floor and roof. new partition, door, flooring, ceiling, kitchen equipment and ventilation equipment as p…
Installation of doors and railing as shown on plans filed herewith.
Installation Of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…