168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary working platform as per plans. working platform shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applicati…
Installation of temporary beta max hoist as per plans. no change in use, egress or occupancy.
Plumbing work filed in conjunction with Alt-Co application
Combine apartments 5H and 5J. Demolition of interior non-load bearing partitions, construct interior non-load bearing partitions and finishes. No change in use, egress or occupancy…
Micellaneous structural framing added to support theater items including curtain, lighting, speakers and mep equipment.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Plumbing and Sprinkler Work in Cellar, First and Mezz floors
Equipment use: single 6000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app…
Remove the existing concrete sidewalk, vault concrete structural slab andd vault steel framing, and install new vault steel framing, vault concrete structural slab and concrete sid…
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica…
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the sidewalk and driveway.
Installation of temporary wire mesh enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica…
Plumbing work associated with interior renovation of Apartment 7B.
Sprinklers/Standpipe work in conjunction New Building # M00648391-I1
Remove (172) heads, Relocate (2) heads, Install (268) new heads and (6) temporary heads on the 10th Floor; Remove (6) heads and Relocate (9) heads on the 13th Floor as per plans (H…
New construction fence within 3'-0 of property line.
Modification of the existing plumbing system in Apt. 11AB. No change to use, egress, or occupancy
Structural scope of work in-conjunction with general construction interior and exterior renovation application, with new bulkhead new roof level. no change to use, egress or occupa…
Interior renovation of existing demised retail tenant, new non-load bearing partitions, ceilings and finishes on 2nd & 3rd Floor Marketing/3rd & 4th Floor Construction as shown on…
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.