168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of outrigger & hoist for facade repair & inspection.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Filing herewith Sprinkler modification to the existing system as per plans. No change to use, egress or occupancy.
Interior renovation erect minor wall partition, install new cooking equipment and exhaust hood for commercial kitchen on 1st. floor and mezzannine. .no change in use, occupancy & e…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed custom color shed at west 15th street, west 16th street,…
Sprinkler work as per plans. no change no change of use, egress or occupancy under this application.
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 3rd floor as per plans (Apartment 3iFRenovations.) No ch…
Removal of interior non-load bearing partitions,doors, finishes lt fixtures, built-in millwork and kitchen equipment. no change to use occupancy or egress.
Sprinkler/Standpipe work for tenant Metropolitan Capital Partners on 9th floor.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress,or occupancy. the sidewalk shed is in front of the building at east 86th street elevation.
Plumbing work to Apt. 1EW. Install new plubing fixtures. No change in egress, occupancy or use.
Installation of temporary overhead protection and working platform in phase 1 to remove all existing debris and installation of a working platform and shoring in phase 2 to allow f…
Associated foundation work for new steel framed rear addition, new steel framed elevator shaft.
Replace oil burner with gas/oil burner on exisitng boiler. change grade of fuel oil from #4 to #2.
Installation and use of suspended scaffold for facade restoration/ inspection as per plan submitted
Filing herewith plumbing drawings for plumbing work Apartment 3F. Replace existing tub with shower, replace bathroom sink and toilet in same location and replace existing sink in s…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed in front of the building at west 15th street elevation.
Installation of doors and railing as shown on plans filed herewith.