24,840 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
General construction work filed to install a chain-link fence surrounding located within the property line. no change to egress, use or occupancy.
Installation of temporary work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
SP work to alter an existing system on floors 2-5, 7 and 8.
Facade repairs to include masonry, pointing, lintels, terracotta, sills, concrete patching, scrape/prime/paint exposed steel if necessary
Outriggers system installation for inspection of facade and repairs.
Plumbing work associated with the fitout of the berriebuilding expansion
Triplex. mechanical work for renovations of aparmtmens 2ab/3b as per plans.
Modification of plumbing system as shown on plans.
Filing for alterations at 2nd floor to convert retail showroom and accessory uses to Eating & Drinking Establishment in conjunction with Diner below. Obtain new Certificate of Occu…
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
General construction work filed to install a chain-link fence surrounding located within the property line. no change to egress, use or occupancy.
Installation of knee bracket as per plans. no change in use occupancy or egress under this application.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this…
Rebuild the water tank bulkhead with stairway on roof. no change of use, egress or occupancy.
Structural scope for new building filed in conjunction with application M00951038-I1
Mechanical work associated with interior renovation of residential dwelling unit
Facade repairs to include masonry, pointing, lintels, terracotta as per plans.
Filing herewith plumbing work as per plans. no change in use, egress or occupancy.
Provide new 4 floor control valve assemblies connected to existing 8 standpipe on 7 floors with distribution and new sprinkler heads.
Filing herewith sprinkler work as per plans, no change in use, egress or occupancy.