FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
full demolition of 5 story structure, using hand held, and mechanical will assist on grade only.
mechanical equipment to assist with demolition & chute will be built to lower debris
Filing for facade repairs work that includes repair of concrete eyebrows, repair of eroded mortar joints, and miscellaneous brick masonry repairs throughout facades, etc. as shown…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Exterior repairs to include sill and lintel replacement, brickwork, sealant and stucco repairs as per plans filed herewith. no change to use, egress or occupancy
Structural modifications to take place First floor and Cellar as per drawings filed herewith. No change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Replace existing gas fired boiler in-kind
Renovation of kitchen & relocation of (2) bathrooms. relocation of washer/dryer.
Installation of steel as per plans.no change to use, egress or occupancy filed under this application.
Install gas hot water heating boiler less than 350,000 BTUH (LAARS Model PH0325CN01CBABR) and (2) indirect tanks (A.O. Smith TJV-120M)
Replacement of air handling unit at first floor lobby, provide access panels as needed, repair ceiling, plaster, prime and paint as needed. this application is being filed in conju…
Repair and replacement of sidewalk vault structural steel and concrete slab on the Cellar Level. No change in occupancy, use or egress.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
It is proposed to repair existing facade as shown on plans. no change to use, egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
EES will be built around all exposures adjoining the neighbors/sidewalks. It will be installed at the top 3 floors and work its way down floor by floor to the 2nd FL in progression…
Interior renovations and modifications to the 1st floor as per plans filed herewith. No change to use, egress, or occupancy.