24,840 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Modificaiton to plumbing as per plans
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement…
Demising of Existing Retail & Build Out of 655 Fifth Avenue Temporary Retail Store. Scope includes demolition, new doors/partitions, ceilings, finishes, shelving units, millwork, m…
Altco filed for interior renovation and tenant fit-out on the 1st floor commercial space, and cellar floor change to a coffee shop as per plans filed herewith.
plumbing work in conjunction with the ot # M01348222-I1
Conversion of multi family to single family residence, revisions to stairs, partitions, kitchen, bathrooms and interior finishes. new roof framing, new stair bulkhead.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Interior fit-out of existing space. no change of use, egress or occupancy under this application.
Bellevue hospital is fitting out an existing 9th floor lab as new it/mdf room. room will be protected with a dedicated single interlocked electronic actuated sprinkler system, with…
Proposed mechanical work in conjunction to arch. designs. no change in use, egress and occupancy.
8936 - Extending existing elevator shaft to accommodate larger cab. No change in egress use group or occupancy. Pro Cert Requested.
Plumbing work is proposed in existing unit #2 on the 2nd floor. Subsequent GC, MH, SP, and exterior applications will be filed. All per submitted plans. No changes to use, egress,…
Construction of 1 story new building for new pneumatic waste collection system for the polo grounds nycha campus in harlem. related applications to be filed as subsequent applicati…
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Debris chute will be installed/built to lower debris from floor to floor. Mechanical means will assist with demolition from exterior and placed on grade.
Pl application filed herewith to perform plumbing roughing as indicated on drawings in conjunction with altco application m01340670, cap/remove existing plumbing piping and fixture…
Partially demolish existing mechanical systems, ductwork, piping, equipment, etc. furnish and install new mechanical piping and valves, accessories, etc. provide all mechanical ser…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Suspended scaffold out rigger installation for facade repair works