168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Hereby filing for the removal, replacement, relocation and installation of fixtures in apartment 12a. no change to use occupancy or egress.
Modification of the plumbing system to install a shower and associated piping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy
Filing herewith drawings indicating modification of the Mechanical system on the 17th floor construction (marketed as the 18th floor). No change in use, egress, or occupancy under…
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Replacement of dual temperature riser piping inclusive of condensate drain piping. no change to use, egress, or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Minor interior renovation to apartment #PHC. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Herewith filed for interior renovation of the cellar within an existing restaurant space. work includes raising the existing floor finish level approximately 16 inches using cold-f…
plumbing work file in conjunction with apartment #2B renovation
Herewith filing for interior renovations as per plans in units 3g &17b as per plans. no change to use occupancy or egress.
General construction application to alter existing joint living work quarters for artists in unit 4e, as per plans. replacement of fixtures, finishes, and lighting. no change to us…
Interior non-structural demolition of a 4 story with basement and cellar per plans
Install 2 roof mounted hvac
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Filing For Sprinkler/Standpipe Application in conjunction with New Building Application # M00580473
Work shall include direct replacement of finishes throughout unit 3c, direct replacement of apartment kitchen, bathrooms, doors, windows and trim. no change to use, egress or occup…
Removal and installation of new sprinkler heads as per plans filed herewith. no change to use, egress or occupancy
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe