24,840 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Install an accessory business set of halo lit channel letters with flanged background panel - sign b
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
File-supported pipe scaffold as shown on the plans. no change in use, egress, or occupancy under this application.
Install illuminated non-advertising wall sign on raceway
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Suspended Scaffold for Facade Restoration as Shown on Plans
Demolition and general construction work on 16th floor as per plans. No change to use. egress or occupancy.
Plumbing work as shown on plans filed herewith.
Installation of Heavy-Duty Sidewalk Shed. No change in use, occupancy, or egress.
Alteration type 2 application filed for installation split ac units. no change of use, egress or occupancy under this application.
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Modifications to the existing plumbing system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Modification of structural work, as per plans filed herewith. No change in use, egress, or occupancy.
Pipe Scaffold Installation
The project includes the installation of new steel beams to close existing floor openings at the second and third floors. A new non-load-bearing party wall separating building no.…
Reach 7- proposed flood barrier sys. includes i-walls w/ cap/wall, micropile-founded t-/l-walls, closure gates (roller @ 2nd pl, swing @ 3rd, flip-up @ sea), slide-up gates, gravit…
Sprinkler modifications taking place on the cellar & 1st floor as per drawings filed herewith. no change in use, egress or occupancy.
Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO #M01264739 as part of NYC DOB MPP Progr…
Chute Installation
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this…