24,484 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Converting existing building from 4 apartments and furnished room into 2 family dwelling units within the same envelope as perplans submitted. the application is also filed to cure…
Replacement of existing air conditioning units to provide cooling for existing duplex dwelling unit. Related ductwork and diffusers. Install electric radiant heat in toilet. No cha…
North hoists-cars 1&2: equipment use: dual 7400# capacity personnel/material hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy…
Rehab/ reconstruct (6) apt interiors #7-27-37-47-57-67 (after water + smoke remediation ) plus corridor work, interior finishes , non load bearing partitions , kitchen and bathroom…
FISP INSPECTION (Facade Inspection Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decola
Plumbing work filed in conjunction with renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: installation of new sanitary, storm, domestic water, san…
Plumbing work as per plans. no change of use, egress or occupancy under this application.
Change of use including interior alterations throughout to accommodate Central Sterile department on 2nd and 3rd floors, and maternity hospital uses on floors 4,5, and 6. Remove An…
Remove & replace fixtures in core restrooms. Furnish and install new plumbing fixtures and related piping in pantry & wellness room. Furnish and install sprinkler main, branch pipi…
Bellevue hospital is fitting out an existing 9th floor lab as new it/mdf room. room will be protected with a dedicated single interlocked electronic actuated sprinkler system, with…
Mechanical modifications to take place on the 20th floor as per plans filed herewith. No Change in use, egress, or occupancy.
backyard Patio restoration including replace membrane and replace travertine tiles with marble tiles as per plans filed herewith. No change to use, egress or occupancy.
Construction of new interior non-load bearing walls and ceilings with wall, floor and ceiling finishes on first and second floors of existing commerical space.
Illuminated non-advertising double-face projecting accessory sign - kilwins. no change of use, egress or occupancy.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Installation of plywood construction fence as per plans. construction fence shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica…
Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or…
Installation and use of suspended scaffold for facade restoration/ inspection as per plans submited
Installation of 7,000 lb dual personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy und…
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado