168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
At 9th floor apt 9e- interior renovation, removal and installation of non bearing interior partitions and related electrical work.
General construction application to alter existing joint living work quarters for artists in unit 4e, as per plans. replacement of fixtures, finishes, and lighting. no change to us…
Interior non-structural demolition of a 4 story with basement and cellar per plans
Install 2 roof mounted hvac
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
M01372041-I1
Installation of suspended scaffold for facade inspection/repair.
Application filed for temporary construction fence to address violation 35647619Z and for NB # M00775662-I1
Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.
Interior alterations of health and fitness use established under separate application #m00666777. no change in bulk, use, occ. or egress. ms, pl, sp worktypes filed subsequently by…
Structural drawings for proposed lowered cellar plan and rear addition with concrete underpinning.
Installation of pipe scaffolding at hoist run and one additional bay as per plan and in accordance with chapter 33 of NYC Building Code.
Structural, foundation, earthwork on the cellar and 1st floor as indicated on drawings
Structural plans and specifications herewith filed for structural scope in conjunction with gc application no. m01250485-i1
Site work including removal of sections of remnant foundation walls, slab on grade and piles. Refer to M01340266-S1 for SOE.
Alteration-co application filed to establish new place of assembly space (cafetria) on the 30th floor.
Installation of material hoist as indicated on the drawings.
Mount Sinai West Observation Beds - Plumbing modifications on 1st Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Proposed horizontal/vertical enlargement and change of use as per plans filed.