168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Install new residential gas dryer and gas piping for apartment 5a.
This project is an interior tenant fit-out for charles tyrwhitt of approximately 1,259 sf. workincludes but is not limited to: construction of interior walls / partitions, wall and…
Installation of a plywood construction fence as per drawings during general construction work. no change in use, egress or occupancy. construction fence to comply with nyc building…
The removal of existing medical gases & piping and replace with installation of new medical gases, piping and equipment of the 18th floor in existing doctors offices.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
The project proposes restoration of facade. the work includes replacement of lintels, terra cotta repair and misc masonry replacement and repairs.
Installation of temporary tent & platforms, various campus locations.no alt to exist structures for Columbia University Special Event Program. TPA permit is required for each event…
Filing for the installation of a combined sprinkler and standpipe system in conjunction with M01223041 I1.
BLDG #1_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; new Mech Equip R…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
NSCP North side Chiller Plant. Structural work for replacement of existing chillers and rooftop cooling towers as per plans.
Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.
Remove and replace all gas piping throughout building including riser and meters. existing gas service to remain.
Structural, foundation, earthwork on the cellar and 1st floor as indicated on drawings
Demolition and removal of ductwork as per plans filed herewith. No change in use, egress, occupancy.
Site work including removal of sections of remnant foundation walls, slab on grade and piles. Refer to M01340266-S1 for SOE.
Structural drawings for proposed lowered cellar plan and rear addition with concrete underpinning.
Interior alterations of health and fitness use established under separate application #m00666777. no change in bulk, use, occ. or egress. ms, pl, sp worktypes filed subsequently by…
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Application filed for temporary construction fence to address violation 35647619Z and for NB # M00775662-I1