24,484 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
rear wall restoration with lintel and sill replacement. removal of fire escape remnants in masonry
Facade Inspection. Designated Primary Site supervisor: Jesus Decola
Exterior restoration: limestone unit replacement, limestone patching, soft joint replacement, cast stone patching, new flashing and waterproofing at 6/f setback and misc. repairs a…
Facade repairs to include masonry, pointing, lintels, terracotta, sills, concrete patching, scrape/prime/paint exposed steel if necessary
Modification of plumbing system as shown on plans.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Interior renovation of an existing eating & drinking establishment ug6 including the installation of non-load bearing partitions, countertops, floor & wall finishes as per the draw…
Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy.
Installation of temporary overhead protection & loading dock for hoist as per plans. temp. equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occ…
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress…
General Constructions plans filed herewith to show interior renovations for apartment 12A. No change to use, egress, or occupancy.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
chute will be built out, to assist with loading out of debris from floor to floor. Bobcat will assist with loading out debris from 1st floor
installation of construction fence to protect site
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Installation of plywood construction fence as per plans. construction fence shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica…
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building n…
Demising of Existing Retail & Build Out of 655 Fifth Avenue Temporary Retail Store. Scope includes demolition, new doors/partitions, ceilings, finishes, shelving units, millwork, m…
The project includes the installation of new steel beams to close existing floor openings at the second and third floors. A new non-load-bearing party wall separating building no.…
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement…