168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior renovations of existing commercial space as per plans herewith filed.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this…
The project proposes restoration of facade. the work includes replacement of lintels, terra cotta repair and misc masonry replacement and repairs.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at 6th ave, west plaza 46th st, west plaza 47th st elevations.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Herewith filing for interior renovations on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
Installation of a plywood construction fence as per drawings during general construction work. no change in use, egress or occupancy. construction fence to comply with nyc building…
Modification to Mechanical System
Installation of temporary tent & platforms, various campus locations.no alt to exist structures for Columbia University Special Event Program. TPA permit is required for each event…
Hereby filing to renovate existing apartment. interior work will include the combination of apt. 12a & 12b. no change to use occupancy or egress.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica…
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this…
Hereby filing for plumbing work related to modifications to the domestic water service and backflow prevention system.
BLDG #11_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; new Mech Equip…
Application filed to renovate apartment 11D with modifications to the non bearing partitions with new finishes - no change to use, egress or occupancy
Interior renovation of an existing 4-story commercial building. use group -vi
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
The removal of existing medical gases & piping and replace with installation of new medical gases, piping and equipment of the 18th floor in existing doctors offices.