25,100 permits · NY · Manhattan
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of new partitions, doors, ceilings and finishes on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th...
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Modification to existing pluming fixtures and related piping as shown on drawings. no change to use, egress or occupancy.
Interior renovations on cellar, 1st, 2nd, and 5th flrs as shown on plans. no changes to egress, occupancy or use.
FILING FOR DEMOLITION OF METAL STAIR FROM 22nd TO 23rd FLOOR. INFILL OF EXISTING SLAB OPENING ON 23rd FLOOR WITH NEW SLAB CONSTRUCTION SUPPORTED BY STEEL BEAMS.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this applicatio...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Unit 3fw interior renovation. remove and install non-bearing partitions. no change in use, occupancy, or egress under this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Exterior facade repairs to make the building facade safe. Facade repair work as per the drawings filed. Repair work includes window crown stones repair, windowsill repairs and decorative units repair....
Plumbing work in apt 3d, filed in conjunction with gc application m01308757-i1
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
General construction to renovate apt 8c on the 8th floor. work will include new partitions & finishes, new wood floor, and plumbing fixtures. no change in use, egress, or occupancy under this filing.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.