25,100 permits · NY · Manhattan
Filing structural work for sidewalk vault repair. work to include new steel beams. no change to use, egress, or occupancy
Existing hvac units gas line disconnect and brance piping replacement and reconnect gas line with new hvac unis in roof area building a, b and c.
INSTALLATION OF 300psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installing swing roof hoist in order to perform exterior repairs. sidewalk shed filed under separate application. no change in use, egress or occupancy under this application.
Installation of a temporary construction fence as per plans in conjunction with building enlargment. no change in use, egress or occupancy. fence to comply with 2022 nyc building code, chapter 33
facade repairwork AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M520_Remove existing water fountain and replace with new bottle filler. For new Hydroponics Lab, provide new sinks, trap primer, floor drains, hose reels, hoose bibb, reverse osmosis filter, and all a...
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Ira rope access facade inspection
East facade repair and restoration including structural work as per drawings submitted herewith. No change in use, egress or occupancy.
Filing plumbing work as per plan filed herewith. Related applications are filed under separate application in DOBnow. No change use, egress, and occupancy under this application.
Plumbing and sprinkler work in conjunction with Alteration Type I gut reno/enlargement. No change to use, egress or occupancy under this PL/SPK application.
Auditorium upgrade, auditorium roof, path of travel, and exterior masonry.
Mechanical miodification to existing retail space on 002 floor (pilates). no change to use occupancy or egress.
Interior renovation of apt 3b on the third floor. no change in use, egress or occupancy.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in...
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Interior renovation to partial 11 floor tenant space (catering/banquet hall) as per plans. no change in use egress or occupancy.