25,102 permits · NY · Manhattan
Renovation of apartment #17 on the 5th floor.
Modifications to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy.
Repairs to exterior wall finishes. No change to use, egress, or occupancy.
Structural alterations on the roof level in conjunction with proposed full building renovation and tenant fit-out; related work as per plans. No proposed change in building use, egress, or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Exterior facade repairs on the north, south, and east elevations. no change in use occupancy or egress.
Installing swing roof hoist in order to perform exterior repairs. sidewalk shed filed under separate application. no change in use, egress or occupancy under this application.
Installing swing roof hoist in order to perform exterior repairs. sidewalk shed filed under separate application. no change in use, egress or occupancy under this application.
Filing herewith plumbing work for interior renovation as per plans. no change in use, egress, or occupancy.
Interior Alteration - Replacing doors, cabinets, lighting, partitions and finishes throughout the office spaces. Removing and installing new walls, adding new ducts throughout. No change in use, egres...
Proposed interior renovation on 5th floor(apt#12). repairing ceiling and flooring. no change in use, egress or occupancy.
Interior renovation consisting of demolition and construction of non-load bearing partitions & lighting. No change in use, egress or occupancy.
Plumbing work for the interior renovation of existing mixed used bldg on Ground floor. All work as per plan submitted. No Change in use, egress or occupancy.
Plumbing work in conjunction with interior renovation to apt. 9g on the 9th floor. as per plans. no change in use, egress, or occupancy under this application.
Installation of temporary debris chute as per plans. no change in use, egress or occupancy.
Mechanical work proposed in existing unit #9A on the 9th fl. Initial General Construction and subsequent Plumbing applications to be filed. All per submitted plans. No changes to use, egress, or occup...
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Filing herewith plumbing modification and installation of fixtures and associated piping as per plans.
Structural infill of floor openings, structural reinforcing and stair structure on the 35th- 37th Floors, as per plans. No change to use, egress, or occupancy.
East facade repair and restoration including structural work as per drawings submitted herewith. No change in use, egress or occupancy.