168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical systems work per submitted plans. no change in use, occupancy, or egress.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under th…
Application file to exterior facade repair as brown stone repair at front elevation as per plan. no change in use, egress or occupancy under this application.
Job filed exist. showroom/factory to remove plumbing fixture and convert bathroom to pantry with one sink per plan on the 20th floor . no change of use, egress or occupancy under t…
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this ap…
Structural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Filing herewith general construction to include interior renovations of dorm rooms & common spaces for ada compliance as per plans.
Hvac upgrades throughout building interior and new hvac units on roof.
Installation of sidewalk shed as shown on drawings. no change in use egress or occupancy. we shall comply with chapter 33 of 2022 bc.
Installation of temporary construction shoring for excavation for hs 285m at 22 east 128 street, manhattan as indicated on plans. there will be no change in the use, egress, or occ…
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permits by others f…
Modifications to existing space with new pantries,restrooms and small scale kitchen, including installation of ceiling hungwater heaters, floor mounted grease trap with all associa…
Interior non-structural demolition as shown on the plans.
Mechanical work as shown on the plans.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Cut openings in existing walls for ductwork penetration and installation of grills and diffusers on 2nd through 13th fl including 2 openings at rated shaft walls. Cut openings in e…
General construction as shown on the plans for the 25th floor.