Installation of temporary heavy duty sidewalk shed in conjunction with facade application # M01205590 per plan submitted. Work shall comply with 2022 building codes chapter 33. No…
Demolition/General Construction as shown on plans filed herewith. No change to use, egress or occupancy.
Application filed for DMO (Means and Methods)
Structural repairs taking place on the 1, cellar and sub cellar 2as per plans filed herewith. No change in use, egress or occupancy
Plumbing work on parts of cellar and 1st floor retail space as indicated on drawings.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of new heads and removal of heads on cellar level as per plans filed herewith.
Interior renovation of apartment 2A on the second floor as indicated on plans to add anew bedroom and a new bathroom with new interior partitions and new plumbing fixtures. No chan…
Interior renovation of an existing apartment on the 10th floor. minor partition changes and new floors as per plans. no change of use, egress or occupancy under this application.
Plumbing filed in conjunction with renovation of apartment #16p. relocate kitchen sink and dishwasher and replace washing machine. no change in use, occupancy or egress.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc build…
Subsequent Application filed for Plumbing (PL) work type. Cellar Floor: Install new sinks. First Floor: Install new sinks and floor drains (from new dental chairs).
Hereby filing for the installation, replacement and relocation of plumbing fixtures in apartment 5f. no change to use occupancy or egress.
Modifications to bathroom and closet at apartment 3ABS
Install new cold-formed steel stud walls at the atrium & steel frame for pivot door at the E. Gallery, infill of exist. slab opening at the grease trap, & steel framing and slab op…
Remove existing fuel oil storage tank as per plans. no change in use, egress or occupancy.
General construction for interior renovation of Apartment 8D on the 9th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
Application filed for roof replacement at harris hall. this application was previously approved under application # m01059646-i1 but is being refiled as per the job being approved…
Remove existing fuel oil storage tank as per plans. no change in use, egress or occupancy.
Structural work as shown on plans filed herewith.
Installation of new combined class i manual wet standpipe and automatic we sprinkler system for new building as per nyc bc 2022, nfpa 13 2016, nfpa 14 2016 & nfpa 20 2016 all as am…