25,102 permits · NY · Manhattan
Phase 4 plumbing and sprinkle modifications to accommodate the n building ed radiology ct renovation in the existing hospital building.
Modification to plumbing fixtures
Hvac modifications for 17th floor (18th floor marketing) it room as per plans filed herewith.
Nyu langone - science building fish quarantine reno - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy.
Ahb egen: addition of dunnage for emergency generator and equipment on the roof, the renovation of the stair to the roof level, the extension of the walkway on the first floor, footing for udg tank.
Ahb egen: addition of dunnage for emergency generator and equipment on the roof, the renovation of the stair to the roof level, the extension of the walkway on the first floor, footing for udg tank.
Pl work filed in conjunction with dob now gc. no change to use, occupancy or egress.
interior demolition of cellar through 5th floors. No structural demolition.
Install Structural Steel to Support Equipment, Light-Gauge Framing to Support New Storefront, Ductwork and Ceilings on Part of 1st Floor
This application involves minor renovation at existing loading dock. installation of door and partition as shown on drawings. no change to occupancy use or egress.
Repair of existing deteriorated masonry around fireplace in Apt. 1B
Work includes per the filed plans steel beam and connection reinforcement at 35th floor multipurpose room and cafe and new steel beam/reinforce existing steel connections at 36th floor to support oper...
Filing for interior renovation of building amenity space as per plans submitted herewith.
Application filed for plumbing work of existing apt 22j in residentialbuilding. work includes:- new toilet and vanity in existing rough.- no change to use, occupancy, or egress.
General construction works as shown on plans filed herewith. No Change in use, egress, or occupancy.
Renovation of apt 2d filed in conjunction with dob now pl. no change to use, occupancy or egress.
Pl fixtures in apt 2d filed in conjunction with dob now gc . no change to use, occupancy or egress.
Propose installation of (3) air-cooled condensing units. No change to use, egress or occupancy.
Temporary construction fence
Removal plumbing/sprinkler components throughout building as per plans. There is no change in use, egress or occupancy as part of this application.