25,102 permits · NY · Manhattan
Ahb egen: addition of dunnage for emergency generator and equipment on the roof, the renovation of the stair to the roof level, the extension of the walkway on the first floor, footing for udg tank.
Pl work filed in conjunction with dob now gc. no change to use, occupancy or egress.
interior demolition of cellar through 5th floors. No structural demolition.
Install Structural Steel to Support Equipment, Light-Gauge Framing to Support New Storefront, Ductwork and Ceilings on Part of 1st Floor
This application involves minor renovation at existing loading dock. installation of door and partition as shown on drawings. no change to occupancy use or egress.
Repair of existing deteriorated masonry around fireplace in Apt. 1B
Filing for interior renovation of building amenity space as per plans submitted herewith.
Application filed for plumbing work of existing apt 22j in residentialbuilding. work includes:- new toilet and vanity in existing rough.- no change to use, occupancy, or egress.
General construction works as shown on plans filed herewith. No Change in use, egress, or occupancy.
Renovation of apt 2d filed in conjunction with dob now pl. no change to use, occupancy or egress.
Propose installation of (3) air-cooled condensing units. No change to use, egress or occupancy.
Temporary construction fence
Removal plumbing/sprinkler components throughout building as per plans. There is no change in use, egress or occupancy as part of this application.
Installation of construction fence during alteration construction, filed separately. construction fence shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress un...
Application filed for sprinkler modifications/additions on the 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Propose to perform interior renovations for removal and construction of non-load bearing partitions and finishes as per plan. No exterior work. No change in use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
inspect windows and frames
Installation of temporary construction fence as per plans during general construction work. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.