168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior alterations of existing 11th floor commercial office space to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
NYC DEV HUB Consultation 7.30.2025. This application filed for the temporary removal of the structures in the plaza to allow for other work on the lot to occur. All structures will…
Installation of new sidewalk shed and pipe scaffolding as indicated on plans. there will be no change in the use, egress, or occupancy under this application
Installation of temporary suspended scaffold equipment.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Nstall swing hoist in order to perform facade exterior work. sidewalk shed installed under separate application.
Temporary Installation to be used on a temporary event Fox Box. All the Installations are to be removed upon completion of the event.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Modifications of interior partitions and finishes as per plans.
Modifications of interior partitions and finishes as per plans.
Interior renovation of office space on the 31st floor per plans filed herewith. no change in use, egress, or occupancy.
Suspended scaffold plans for facade repairs and inspections
interior and exterior renovation of the townhouse as shown on plans filed herewith. no change to use, egress or occupancy.
Filing for plumbing renovations in apartment units as per plans filed. No change in use, egress or occupancy.
Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with BC2022 chapter 33. No change in use, egress and/or occupancy under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Storage of material / equipment on top of heavy duty sidewalk shed. storage shall not exceed 25 psf. shed filed under separate application. storage shall comply with ch#33 of the n…
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of a heavy duty sidewalk shed & medium duty pipe scaffold as per plans in conjunction with general construction work. no change in use, egress or occupancy. pipe scaff…