168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Perform plumbing modification work inconjunction with apt#6j renovation. replace and install plumbing fixtures. no change to use, egress, occupancy or fire protection. general cons…
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Annenberg 12 ccsi buildout - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the nyc building code 2022. no change in use, occupancy, or egress under this app…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Hereby filing remove, relocate and install sprinkler heads with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to remove, relocate and install new sprinkler heads with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to remove and install sprinkler heads with related piping for auction house renovation as shown on plans filed herewith.
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Installation of 300 psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under t…
Installation of 300psf & 600psf sidewalk shed as per plans. storage of material is allowed where indicated on plans. shed shall comply with chapter #33 of the nyc building code 202…
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Application being filed for the installation, relocation, and replacement of Sprinkler fixtures as per plans filed herewith. No change in use, egress, or occupancy.
Herewith filing for sprinkler modifications as per plans. no change in use, egress or occupancy.
Sprinkler work on the 14th floor (Cornspring) as indicated on drawings.
Full demolition of existing 1-story building
Foundation for elevator shaft as shown on plans filed herewith. No change to use, egress of occupancy.
Convert part of second floor into tenant recreation space. work to include general construction, as per plans. obtain amended co upon completion.
Install new chimney liner and extension as per plans. no change in use, occupancy, or egress.