2,158 permits · PA · Pittsburgh
Wire addition and install new electrical service
City Funded Demolition 1. EMERGENCY CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. Contract term 15 days. Start Date: 1/21...
Upgrades
Replace two standard efficiency hot water boilers in the same residence. Standalone Permit.
New service and distribution equipment to serve ev chargers in existing parking garage
Interior alterations throughout to include new finishes kitchen and bathroom renovations and framing modifications. exterior alterations to include new doors windows siding and roof. change in use to...
Existing (alteration/addition)
Addition of (2) co detectors and (1) horn/strobe
Interior alterations for initial fit-out, including enlarged cafe, new walls, restroom, casework and finishes.
Interior alterations to existing tenant office space. work includes selective demolition, new walls, ceilings, doors & hardware, casework and finishes.
Alteration to the existing or rooms to add structural members for new equipment (replace x ray). work includes new steel structural members, ceilings and finishes on level 1 of upmc presbyterian hospi...
100amp Service Entry
Replacement of finishes in common corridor and single-user toilet room. work includes selective demolition & removal of existing finishes, new walls, ceilings and finishes.
Modifications to existing sprinkler system and 1st and 2nd level risers as part of interior alterations to the sterile processing department locker room and adjacent areas on level 02
Minor alteration
Installation of a 11.07kw roof mounted solar system with (27) 410w panels and (1) 10kw inverter.
Existing (alteration/addition)
Existing (alteration/addition)
Existing (alteration/addition)
Updating panel - Current Panel is 100 amps and new panel will also be 100 amps. We are not increasing Amps.