10,782 permits · NY · Queens
Alt c.o to convert cellar into basement & do interior renovation to convert 4 existing doctors offices into 4 residential units.to comply with violation #34931398x. erect partitions & do ms,pl work un...
Herewith filing for interior reno9ation of one-family & new horizontaladdition # 2nd floor rear of building as pe
Filing plumbing work type including underground site connection in conjunction with nb app q01169174
Filing for Facade Repairs work that includes repair of concrete balconies, application of sealants, waterproofing coatings, etc. as shown on drawings filed herewith. No change in use, egress or occupa...
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils a...
Herewith filing alteration in conjunction with alt # q01065694-i1for plumbing work in cellar, first, second & osp as per plans filed.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Construction Fence
Installation of 33.88 kw solar energy system on roof. No change of occupancy, use or egress.
Sprinkler & standpipe specifications filed in conjunction with gc application q01261189-i1
Structural work as shown on plans filed herewith. Filed in conjunction with New Building application Q00674206-I1.
Herewith filing alteration in conjunction with alt # q01108749-i1for plumbing work in cellar, first, second & osp as per plans filed.
Plumbing modifications and installations in conjunction with tenant fit-out per plans filed.
P.S. 124Q: HVAC Chiller System removal and replacement including ventilation upgrades throughout the school building. No change to Use, Occupancy or Egress
Herewith filing 8 foot high temporary plywood construction fence in conjunction with new building and labor/materials covered under nb#dobnow#q00662886 for proposed 6 story 20 dwelling unit apartment...
Hereby filing for related mechanical work for new building application# q000487705-i1
Hereby filing for related mechinical work for new building # 421133730
Filed to correct summon#39169604h. removed 2 mini splits air conditioners units at rear yard.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.