168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Herewith filing for repairs to the facade at this existing building. No change to use, occupancy or egress.
Filing support of excavation in conjunction with nb app q00627252-i1
Partially remove the wood shed/garage and keep the pavement for the Owner's future use. The adjacent shed/garage is to remain.
Installation of stormwater management system (subsurface detention tanks) per dep private property green infrastructure retrofit incentive program. no change to use, egress, or occ…
Install 8' temporary construction fence at the above address
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Replace sunrooms and modify non-load bearing partition walls.
Direct replacement of (2) 12.5 ton roof top hvac units. no change to use, occupancy, structure or egress.
Proposed vertical & horizontalenlargement of existing 2-fam. buildingsbulletin 2011-010 -the 3-fixture bathroomlocated in the cellar shall be used solely in connection withthe dwel…
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
As per bb 2025-006, proposing an adu not in a cellar, basement, or det garage. adu is proposed at 1st floor and permitted as per bb 2025-006.
Facade repairs as per plans filed herewith. No change in use, occupancy or egress.
Mechanical upgrades and chiller replacement on roof as shown on plans filed herewith. no change in use, egress, or occupancy.
File plumbing work type in conjunction with job # q01104726.
General construction to renovate penthouse 2b on the 40th floor. work will include new partitions & finishes, new floor tile, and new plumbing fixtures. no change in use, egress, o…
Proposed four story 6-familyresidential building.obtain new certificate of occupancy.
Install 8' high plywood construction fence along adjoining lots 21, 22, 24 & 48 in conjunction with demolition of 45-33, 45-35, 45-39 davis st & 45-40 pearson st
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
full demolition of 2 story structure using mechanical means from grade.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed in front of the building at 81st street elevation.