168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Facade repairs as per plans filed herewith. No change in use, occupancy or egress.
Mechanical upgrades and chiller replacement on roof as shown on plans filed herewith. no change in use, egress, or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Proposed four story 6-familyresidential building.obtain new certificate of occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Renovate existing two family dwelling as per plans filed: work entails replacement of fire damage partitions, doors , windows and finishing
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed in front of the building at 81st street elevation.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Install 8' ht construction fence aligned with property line and work in-conjunction with nb#421542165. no change of use, egress, or occupancy under this application.
Installation of solar panels, rooftop, grid tied, railed, 26 modules, 10.66 KW
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Herewith filing drawings for interior demolition & removal of existing non-structural partitions and finishes at partial 1st floor. no structural work or removal of structural elem…
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
Plumbing work for existing two family dwelling. install new plumbing fixtures @ cellar, 1st and 2nd floor as per plans. no change in use, egress and occupancy.
General construction to renovate cellar and first floor of an existing school. installation of new partitions and finishes as per plans. no change to egress, occupancy or use group…
Vertical & horizontal extension of existing one family and superseded alt-2 job#421375693. obtain new c of o.
Interior renovation of existing one family. change metes and bounds. obtain new c of o.
NYC DEV HUB - Underground plumbing work in conjunction with new building construction.