10,782 permits · NY · Queens
temporary construction fence; 8' high at lot lines
Replmt (1) new low pressure boiler replmt (1) new comb. gas/oil burner. straight gas only at this time. in conjunction with boiler burner filing #400503095 & 420506401 signed off. straight gas at this...
Filing for interior renovation of apartments #5, #9 & #13.repair/replace existing partition walls (spackle & sand as needed) new paint, new flooring, new interior doors,replace existing kitchen applia...
Propose one car garage
Balcony installation 2nd story level building exterior at exposure#1, #2 and #3 as per plan. No interior work with this investigation report. No change in use, egress & occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Replace and install new plumbing fixtures as per plan.
Structural framing plans for proposed staircase in the existing 1-story building. the scope of work involves only steel framing for staircase opening. no other work. this job is filed in conjunction t...
Install new construction fence as per drawing.
To add a new accessory kitchen in cellar and a new egress stair to grade from cellar to an existing 1 story eating & drinking establishment. changes in interior partitions, no change to bulk of the bl...
Filing mechanical work type in-conjunction with NB job#Q00970072-I1.
Install 10' drop curb with 1'-6 splays on bothside in conjunction with job#q01022119-s4
Install 10' drop curb with 1'-6 splays on bothside in conjunction with job#q01022121
Herewith filed alteration type 2 application for a horizontal & vertical extension over an existing one story and to erect interior non-load bearing partitions. subsequent filing to include extension
Temporary construction fence.
Erection of temporary construction fence for renovation work on ground floor at property perimeter as per submitted drawings. no change in occupancy, use or egress.
Proposing Plumbing Fixtures - (7) Drains, (1) Grease Interceptor, (1) RPZ, (1) DCDA. (1) Gas piping (2) gas -Rooftop HVAC units
Q161_Abandon existing gas-fired hot water heater in place. Disconnect and demolish existing and exposed gas piping. Install new heat pump hot water heaters and insulated piping.
Install new temporary construction fence.
Subsequent plumbing work type in relation to nb application # q00863076-i1