10,644 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Alt-1 file to renovation existing one-family dwelling with horizontal and vertical extension
PROPUSE 14 PLUMBING FIXTURES, no three piece bathroom at cellar level. two piece bathroom only at cellar
Application filed for vertical and horizontal enlargement with interior & exterior renovation of existing 1 fam residence.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
File to remove and cap existing boiler and install 2 new tankless water heaters with existing gas valve with neutraliziing kit, drain and trap. no change in use, egress, or occupan…
Conversion of the existing one and half story one-family building into a two story two family building as shown on the plans. proposed vertical and horizontal enlargement. interior…
Herewith filing soe plans of 2 story bldg. the soe plan involves 1:1 excavation on all exposures. this job is filed as subsequent application with the dob job #q01194421-s5
filing new structure for an electric vehicle charging facility with (60) EV charging stations
File pl worktype in conjunction with job#q01255086
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
New building - 2 families
Plumbing work for fit out of raw retail space (Target) filed in conjunction with NB # 421928953 with no TCO issued for said space
Installation of underpinning as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Replacement of chiller for building mechanical system located in cellar mechanical room.
Plumbing work for a new supermarket. No change in egress, use or occupancy
Proposed sprinkler work in cunjunction with new building app # q01262888-i1
Ecb violation 39156779r -- foundation
Installation of new sprinkler heads & piping in cellar, first & second floors from main fire protection service after existing back flow preventer assembly.
Installation of temporary suspended scaffold equipment.
Installation of 4.86 kw solar energy system on roof. No change of occupancy, use or egress.