168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
HPD & DOB IED to fully demolish landmark building, due to extensive structural damage due to fire, with partial collapses throughout all floors.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Alteration file for conversion of the existing two story, one family building into a two story , two family building. proposed horizontal enlargement at rear. as shown on plans . o…
Full demolition of existing 2.5 story house
Install exterior illuminated wall sign ( juici patties)
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Install new plumbing system for 5-story building subsequent with nb job#q01266902.no change in use,egress and occupancy.
Minor energy lighting work related to CVS Retail renovation. No change to use, egress or occupancy.
General construction for parapet wall replacement at north and south elevations and masonry repairs at roof as per plans filed herewith. no change in use, egress or occupancy.
Replace one (1) gas-fired high pressure boiler as per plans. no change in use, egress or occupancy.
Clean surface rust and apply anticorrosive paint to prevent future damage to the structural members. Provide anchorage of pit ladder to the pit floor slab. Repointing deteriorated…
Proposed to install new sprinkler & standpipe system for 6-story mixed use building.
Replacement of 12.5 ton capacity rooftop unit. no change to egress, use, or occupancy.
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB #421134132.
Proposed brickwork at rear facade and new steel deck at 2nd floor.
Gas connections for direct replacement of sixteen (16) split units HVAC systems.
Amend certificate of occupancy and add ramp to front entrance
Addition of(1) WC and (1)Lavatory
Interior renovation of existing commercial space @ 1st floor a per plan. no change in use, egress and occupancy.
Filing for interior renovation of apartments #5, #9 & #13.repair/replace existing partition walls (spackle & sand as needed) new paint, new flooring, new interior doors,replace exi…
To file a support of excavation in conjunction with nb application q00783360-i1