10,782 permits · NY · Queens
Interior renovation of 11th fl of existing 14 story building, demolition work and construction work as per plan, partition, flooring, ceiling and painting throughout, no change in egress, use, or occu...
Installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.84kw
Installation of 84.4 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 83.6 kw solar energy system on roof. No change of occupancy, use or egress.
Removal of non- load bearing partitions at 1st floor of existing dental office
Installation of 82.8 kw solar energy system on roof. No change of occupancy, use or egress.
Interior alteration of existing commercial space on the first floor only. install new partitions, floor/wall/ceiling finishes & lighting fixtures. install mini split units. replace exist. plumbing fix...
Herewith filing this application for Support of Excavation for the proposed alteration as per the GC drawings.
Installation of solar panels, rooftop, railed, grid-tied, 13 modules, 5.33kw
Support of Excavation at sidewalk/street, pile and reinforced concrete pile cap foundation for the installation of pre-cast concrete con edison vault
Installation of solar panels on roof. no change in use, occupancy, or egress.
Installation of solar panels, rooftop, railed, grid-tied, 12 modules, 4.92kw
Rooftop solar installation. no change to use, occupancy or egress.
Plumbing work type filed subsequent to ALT-CO application number: Q01019235-I1
Filed herewith to install new glass door and window, no change to use egress or occupancy.
Plumbing application filed in conjunction with application #q01317467-i1 and resolve ecb violation #39166390h
Filing to address & correct violation #34869833r. the scope includes the complete removal of wood structure approx 8' x 8'x 10'h w/roof & plywood walls at rear of property. no change of use, egress or...
Filing to reconstruct a storehouse building located inside of flushing meadow park, heatingwill be provided through five existing unit heaters with twonew energy recovery ventilators, ventilation will...
Installation 84.8 kw solar energy system on roof. No change of occupancy, use or egress.
Install new exhaust fan at existing toilet and extend existing exhaust duct line and relocate exhaust fan and install mini split system. mechanical work for exhaust hood in existing commercial kitchen...