10,782 permits · NY · Queens
Demolition of piping, pumps and associated equipment for fuel tank removal under Q08022706. Installation of new piping, pumps, and associated equipment for new fuel tanks installed under Q08022501.
New Condensing Boiler Hot water plant with pumped distribution
Propose new 16-story residential building with 52 dwelling units. obtain new c of o.
Proposed new two story two family dwelling building. obtain certificate of occupancy.
Sprinkler and standpipe work related to the construction of a new 12 story affordable housing building as per plans filed herewith.
New concrete pad on grade to support new vertical tanks. new doorway opening in fabricated steel building. no change to use, egress or occupancy.
Sprinkler and standpipe work related to the construction of a new 12 story affordable housing building as per plans filed herewith.
Submit temporary construction fence at open space, no change in use, egress or occupancy.
Installation of pipe scaffold at existing building 64-20 175 street, queens as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
216q- eb_ soe design for the existing building elevator lift pit and entrance stair removals filed in conjunction with q00857440. all as per plans filed herewith
Non-structural repair work to all exterior wall areas and localized roof sheathing that were removed during DEP-permitted asbestos abatement; no change to occupancy, use, egress, or structure.
Application file to remove canopy approx 15ft long x 4ft wide & suspended approx 12ft above sidewalk by two 20 metal pipes and attached to the drick of the building on ther other end. no change in use...
Herewith file alteration in order to erect 8 foot temp. construction plywood fence. no change to use occupancy or egress.
Installation and modification sprinklers system for partial cellar level space G1B (FORNEVER) commercial space in conjunction with application #420653607 with new partition work and finish work as per...
Herewith filing for the installation of a new fuel storage tank in connection with the emergency generator for the new building.
Propose a new 2-story 2- family building.
Interior renovation of an existing 2-family residence as per the plan filed herewith. no change in use, occupancy or egress.
Install new wood construction fence as per drawings.
Interior renovation at cellar only as per plan. no change in use, egress and occupancy.