10,782 permits · NY · Queens
Proposed new 10'-0 conc. curb cut include 1'-6 splay on both side.
Partial interior renovation - no change of use, egress, floor area, footprint, and strusture. no vertical / horizontal extension and enlargement. no change in envelope or any item affecting the energy...
Installation of mechanical system for entire building in subsequent to new building application q01139599
Herewith filing for proposed installation of new plumbing & gas fixtures on cellar & first floor filed in conjunction with alt job number # q01118631-i1.
Non-structural repair work to all exterior wall areas and localized roof sheathing that were removed during DEP-permitted asbestos abatement; no change to occupancy, use, egress, or structure.
Installation of photovoltaic solar array on existing roof system as per plans
PS216Q-EXISTING BUILDING STRUCTURAL- WORK .The scope of work consists of the removal of an existing concrete column as well as the supplementary framing required to accomplish this scope at each floor...
File plumbing application in conjunction with GC application Q01342616.
File job to address open ecb violations # 39133703z,39133704k, 39133699p, 39133697l, 39133696j, 39133698n, & vacant order # 4983343, restore the building back to twofamily house along and install 2 bo...
PS216Q-EXISTING BUILDING WORK Renovation of rooms and all adjacent conditions at the south east corner of the existing building to provide a corridor connection to the Building Addition.
Full demolition of existing 2-1/2 story detached residence.
Legalize three pieces bathroom in the cellar.
Temporary fence in conjunction with TPA # Q00920211
The scope of the work includes the installation of the supplemental cooling systems for the girls gymnasium.
Proposed plumbing work at an exist restaurant of an 1 story commercial building asper plan. no change in use, egress and occupancy.
Temporary standpipe work related to the construction of a new 12 story affordable housing building as per plans filed herewith.
Renovation of the cellar to use as an accessory to the one-family home: demolition of non-load-bearing partitions and renovation, and legalization of a three-piece bathroom. Renovation of the first fl...
Alt-GC Filing for Horizontal Extension at NYC DEP Own Facility on an Existing 01 Story Building. No Change in Use, Egress, and Occupancy.
General renovation on exist commercial space with remove partition, repair/replace/new partition, flooring, ceiling, door, painting work, and install new split type a/c as per plan. no change in use,...
Interior renovation of an existing two-family dwelling, including modification of kitchen and bathroom. no change in use, egress, or occupancy