10,468 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
To erect new 9 story commercial building.
Tenant fit out: Installing plumbing fixture to accommodate new layout. Modification the existing sprinkler layout to accommodate the tenant fit out
Filing foundation work type for limited foundation element in conjunction with nb application q00568550
Filing herewith for construction fence
Temporary construction fence filed in conjunction with alt1 #421941368 for alteration of 1-family house with 2-story plus cellar addition.
Filing herewith for the demolition to existing cellar and 1st floor as indicated per plans. There is no change to use, egress, or occupancy.
Herewith file alteration to do a vertical extension to an exist 1 1/2 story one family dwelling.to erect interior partitions, to do ms , pl structural work-types to be filed under…
Hereby filing general construction work at existing commercial space (cel,001,002). work filed to repair fire damage at interior and exterior. plumbing work filed separately.
Existing Porch at the first floor and Terrace at the second to Be Legalized
Filed herewith plumbing work type in conjunction with application #q01337680-i1
Horizontal and Vertical Enlargement of existing one family dwelling unit. obtain new C of O.
Application herewith filed for all plumbing and gas work in conjunction with CO application.
Minor interior renovation of existing restaurant on 1st fl as per plan filed herewith. no change in use, egress or occupancy.
Partial interior alteration of an existing single-family duplex unit with plumbing work. two new plumbing fixtures for the new powder room on the first floor. no change in use, occ…
Plumbing work for existing 2 family, 2 story w/ cellar residential building. no change in use, egress, or occupancy.
Propose to provide mechanical plans for existing 2 family residential building. no change in use egress or occupancy
Installation of construction fence as per the plans filed herewith. no change in use, occupancy or egress.
Herewith filing st plans of 2 story bldg. the st plan involves wood framing
Installation of solar panels on roof. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.