168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Southhall Station Townhomes, 6 units, Lots 32-37, VB Construction, R3 Occupancy, SPR#-0106-2022, Typ
Relocate washer and dryer from kitchen to spare room. Move the stove to rear wall of the kitchen and
1790sf b occ [a-2 < 50] 5- b const 1 story no sprinkler hsipop-163115-2026 we need to add on to t
Renovate existing 1,804 square feet of the house including kitchen, bathrooms and some moving of wal
Replace existing uncovered front cement stoop/brick stairs with a 28ft covered porch and deck-style
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
New Construction Everlee Lot 12 Monoslab Rear Screened Porch
New Construction Everlee Lot 13
Converting hall closet to half bathroom. Installing 1 toilet, bathroom fan and light, one electrical
New Construction of 800sf ADU
Full kitchen remodel, including new cabinets and moving electric range and exhaust vent. New skyligh
Roof Replacement
Renovate existing kitchen. Remove connecting wall between kitchen and living room to open space. R
800 Square foot ADU build. With 100 square foot attached wood deck, and driveway extension to servic
Remove and replace 5windows like for like no structural changes.
Shed 12x16
Like for like shingle replacement. Remove/replace asphalt shingles roof to deck. Install new felt, I
Like for like shingle replacement. Remove/replace asphalt shingles roof to deck. Install new felt, I
Like for like shingle replacement. Remove/replace asphalt shingles roof to deck. Install new felt, I
Sunroom addition with mini split and fireplace.
Replacing back patio doors with sliders and adding an additional slider. Headers to be installed in