168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Project was originally processed as PLMNR-001942-2026 processing using the resubmittal timeline of 5
Replace existing deck with identical dimensions.
Installing new deck in same footprint as existing: 14' x 11' No electrical, plumbing, or mechanical
BLDNR-036689-2025 ***BUILDING #6*** Eight (8) separate 4 story "Flats" apartment buildings, 5 havin
BLDNR-036690-2025 ***BUILDING #7*** Eight (8) separate 4 story "Flats" apartment buildings, 5 havin
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
BLDNR-036686-2025 ***BUILDING #3*** Eight (8) separate 4 story "Flats" apartment buildings, 5 havi
BLDNR-036691-2025 ***BUILDING #8*** Eight (8) separate 4 story "Flats" apartment buildings, 5 havin
BLDNR-036687-2025 ***BUILDING #4*** Eight (8) separate 4 story "Flats" apartment buildings, 5 havin
BLDNR-036688-2025 ***BUILDING #5*** Eight (8) separate 4 story "Flats" apartment buildings, 5 havin
BLDNR-036692-2025 ***BUILDING #2*** Eight (8) separate 4 story "Flats" apartment buildings, 5 havin
Red Grove Place Townhomes, 2 units, 2 stories, VB Construction, R3 Occupancy, each unit 1170sf. Appr
BLDNR-033060-2025 ***BUILDING #1*** Eight (8) separate 4 story "Flats" apartment buildings, 5 havin
an existing old deck needs to be replaced with same design and size this upgrade is needed due the
Inn Flow - Interior alteration of existing 17th floor suites to create (1) single tenant full floor
New canopy added to existing exterior mobile bar area
Renovation of an existing 3-bedroom, 2.5-bathroom single-family residential home. No changes to abov
ADU over detached garage in the rear of a new construction home: Permit BLDR-031371-2025
New sunroom on a new deck. Electrical work: 3 duplex outlets, egress light, GFCI, switches.
Remove and replace the rear gable roof above the master bedroom. 19"x30". Remove the entire section.
Finish off third floor bonus room. Framing and all rough-in's for plumbing, electrical and mechanica