1,315 permits · NC · Raleigh
complete the interior structure to accommodate Peach lab workout studio
Starbucks Pylon Sign (L)
5-story Residential multi-family apartments of type IA and IIIA construction, with structured parkin
Renovation of 4 unit multi-family residence to restore original interior and exterior condition Rep
**COR PRJECT** 200 Amp Service Meter address: 528 Method Rd Installation of four (4) sports lightin
12x12 detached deck
The scope of work in these documents include the interior renovation of approximately 18,000 square
changing unfinished/inhabitable place within the home into a finished living area - master bedroom s
Demo existing steps and construct a new 10'x19' over the existing patio with a new set of steps. Imp
ADU- one bedroom, one bath. Standalone bldg on back of property. Porch on 3 sides. No garage.
UPDATED: Construction of one new deck: T-shaped wooden pool deck at back of house (to sit alongside
Replacement of Lake Howell retaining wall
repairs to unit 115, drywall, painting, electrical ** ZONE-034013-2025 Fire damage
Remove and replace 5 windows like for like no structural change
Pediatric Therapy Associates B OCC 4480 SF Interior alteration of an existing 1st floor suite in med
Remove and replace 2 windows and 1 door like for like no structural changes.
Remove and replace 8 windows like for like no structural changes.
**COR PROJECT** Addition of a temporary office trailer #2 (24'x60') for the Red Hat Amphitheater rel
Remove and replace 14 windows like for like no structural changes.
Replacing existing deck with 18'x16' screened porch and an 11'x14' open deck. PLAN REVISION: EXPANDI