6,582 permits · CA · San Francisco
title 24 energy compliant electrical drawings to be added to building permit 202512081227
kitchen remodel without layout changes (mep). replace (2) windows in-kind. remove partition wall in the kitchen.
6/fl- deffered structural for equipment anchorage
remodel of 2 bathrooms(e) & remodel of kitchen(e)
revision to pa #2025-0718-1191: modification to sim lab, 602b-302 change of lab to office, four sound booths and been added throughout the plan.
replace garage door. in kind same opening. street facing.
prop h: change of use at g/f to childcare facility -add children ada restroom, food prep/laundry area, activity area & playground,install plumbing, electrical, hvac, floor & wall finishes. deferred st...
removal of drywall in lower basement. client states there is mold present in basement level. all work is interior in the basement level, approx. 250 sq ft. a separate permit will be applied for to com...
exterior stair repair, less than 50% replace with new wood in-kind, not visible from the street. exterior support post repair, replace rotted section with new wood in-kind, not visible from the street...
exterior stair repair less than 50%, replace with new wood in-kind, not visible from street.
installation & relocation of mechanical & plumbing systems
2nd flr. revised plans pa#: 202602065383 to show 5 added duct detectors and 5 relay modules. scope also includes 1 power supply, 2 smoke detectors, 1 monitor module, 1 control module 20 speaker strobe...
commencement of work not started under previously approved permit application # 201805189575.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
change copy on (e) double faced blade sign.
unit #8: addition of pre-existing wall and room door on western portion of living room, to including new lighting, closet, and removal and reinstallation of existing steam radiator, paint all areas an...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
remodel an (e) kitchen. remodel an (e) full bath. add a powder room. add a new sub panel.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)