6,582 permits · CA · San Francisco
2/fl- take (e) conditioned room and convert into a commerical shared kitchen to include countertop, sink, cooking appliances air fryer, microwave, and 2 burner range) and fridge.
lower the concrete slab approx 1 ft to achieve 8 ft ceiling height on the ground floor. replace the existing concrete foundation in kind and add a full bathroom on the ground floor. replace the concre...
unit #8: install one new clothes washer and dryer. no wall demo.
reroofing hot works
reroofing with hot works
reroofing: hot works
revision to pa# 202506047943. structural footing, radiant heat, revised bathroom layout for strutural coordination.
revision to 202508263917: install retaining wall 5' high in rear yard w side stairs
revision to 202603046957 to include: new sliding glass door and window in bedroom 1. seismic retrofit to account for new door and window.
re-roofing (w/ hotworks)
north detached garage (1114a shotwell st.) -add 1-bedroom adu per ord. 162-16. infill garage door -add entry door and 3 windows at front facade
revision to pa# 202510016490: revise the design of the new concrete retaini9ng wall to one with spread foundation instead of deep piers.
28th fl - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be apped...
south detached structure (1112a shotwell st.): 1-bedroom accessory dwelling unit in rear detached garage adjaent to virgil street per ord 162-16. infill garage doors - add entry door and 3 wood window...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
6th floor. 2 way emergency comminication system. tenant improvmenet. add 1 call station 6th fl elevator lobby to existing jeron system ref 202512222450
main structure (1116a & 1118a shotwell st) -add (2) ground floor adus per ord. 162-16. .lateral upgrade under separate permit.fire sprinkler & full building fire alarm system under deferred permit.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
unit g: like for like bathroom remodel, m.e.p. staying in the same location, (e) tub to be replace by another tub
interior remodel of 2nd/f unit, demo & replace center living room post, demo & replace both bedroom closet walls & doors, remodel of e) interior space including kitchen & both bathrooms