6,582 permits · CA · San Francisco
19th fl: partial ti revision to 202509044565.deferred clarification to dph for use of butler pantry area 19303. removal of pantry equipment from scope.
comply w/planning violation #2018-001512ef. add 1 adu w/1 bedrm & 1 bath, unit #17 at ground fl. (legalize in-law unit #16 at rear of g/f under sep. permit pa# 202201045352). sprinkler g/f adu unit #1...
cripple wall bracing @ ground floor i.e. bolt foundation w 5/8" tr @ 7" min embedment @ 48" max spacing. add 1/2 struc 1 plywood nail 6" edge 12" field. plywood over portions of cripple walls, min. 50...
unit 1: interior demo of all finishes (acm) in living room & kitchen. remove carpet. unit 2: interior demo of all finishes (acm) in all rooms. remove carpet. unit 3: interior demo of all finishes (acm...
interior/exterior renovation of an (e)2 unit,wood framed residence,including reinforcement of(e)brick foundations & seismic stiffening.new kitchens,plumbing upgrades,electrical upgrades, new fixtures,...
ollegalize (e) bedroom. convert powder room to full bath at g/f. remodel (e) kitchen, bathroom, & add full bath on 2/f. two new sliding doors at rear on ground floor (expansion of existing window open...
6/fl- construction of walls for exhibit gallery upgrade to bathrooms toilet paper dispenser
revision to pa #202305026865 s2 to address 7/10/2025 correction notice: clarification to 3/25/24 ab-005 as updated 12/22/25 re: ceiling finishes at basement
re-roofing (w/ hotworks)
grouting/foundation at sideyard on property line. to comply with nov #202537412. ref pa 2024.1023.3557
recommencement and completion of work under pa# 202409261751.
exterior wall repair to comply w/ nov 202539215 will not affect public right of way
re-roofing (w/ hotworks)
1/fl- replace (e) rear door and windows with 1 (n) door
repair of existing fire rated wall at water heater room in basement.
revision to pa#202507160915. the 2 windows in kitchen, one will closed off and the other one willl be replaced. change kitchen layout, one window in living room , one in laundry room will be replaced....
tear off (e) roofing and reroof with torch down at flat roof. no work to front facade sloped roof. no work to (e) roof structural sheathing. no structural work.
bathroom remodel in kind of (e) 1st floor bathroom to include (n) plumbing and electrical, tile, and fixtures. no wall removal or layout change. no change to floor layout. no structural work.
replace sheathing (ref to roofing 202601214239)
reroofing (no hot works) install new asphalt shingles over the entire roof area, install new flashing on all roof penetrations, edges, layers. ref to sheathing pa# 202601214240