6,583 permits · CA · San Francisco
convert (e) storage space of 539 sq.ft. to living area at the basement level. partial garage conversion of 288 sq.ft to living area at g/f. infill lightwell of 36 sq.ft at the upper level. install new...
revision 202203210384 - to include the remodel of (e) kitchen and the alteration of (e) north and eastern facing window
unit 9-12- design and install retrofit automatic wet fire sprinklers system per nfpa 13 (2022 ed) and the design and install of a 2" fire service per sffd and water dept. ref ti 202504033634
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
common areas: to comply with nov 202548140 #2: install missing handrails where needed. (12) handrails total.
1)unit #1a: install 2 windows,street facing, replacement same kind vinyl windows as existing. no framing change. 2) stucco patching.
rebuild exterior entry stairs to bring into compliance. new front facade windows, withing (e) window openings. new exterior swing door for garage level. no change to (e) garage door or (e) entry door....
to obtain final inspection for work approved under pa# 202111122319, 202301250742 & 202303234305. al work is complete.
legalization of rooftop decorative rail in response to nov 202418673. roof to remain unoccupied.
fl1: partial bathroom remodel (toilet, vanity/faucet, shower valve). throughout house: upgrade elec. and replace sheet rock(5/8x) in kind @ select demo (for electrical): 1st fl: office, 2nd fl: living...
revision to pa 202311019917 (commercial soft story) to remove mep deferral requirement
replace 10 windows on front of house (street facing) w/ vinyl windows (same style/hung), same location, same opening, same size windows
modification of an att&t unmanned (e) wireless facility:r/r 3 antennas & 3 rrus. install 2 conversion upgrade kit; converter/rectafier expansion shelf: 10 converters & 3 50 amps dc breakers in (e) net...
convert ground floor wine storage room into sleeping room. relocation existing bathroom and install wet bar. legalize installation of wet bar in response to n.o.v. #202317497.
1st fl interior ti: non structural interior walls & ceiling in office area. mep deferred
kitchenette added to permit room of property
25th fl: interior ti- conference room, pantry & restrooms. demo of non structural partitions, ceilings, finishes. new non structural partitions & glazing new doors & hardware, lighting and ceilings.ne...
revision to pa #2025-1031-8701: repair basement floor side wall foundation at remodeled area. replace all single pane windows & doors to energy compliant windows.
ste 1000 - remove existing rooms and t-bar ceiling; lighting replacement @ open office; removing existing walls for new window wall
convert g/f vacant storage to 3 new adu per ord#162-16. replace wood framed stair at rear yard in kind. coordinate work w/ soft story #202501305531. infill light wells at g/f & rear expansion at g/f.