6,505 permits · CA · San Francisco
add a new 9ft wide 2nd fl deck in the rear with spiral stairs. no fire wall construction.
unit 7: to comply with nov 2022542811 items 2-4: remove 4 sliding windows and install 4 sliding white vinyl windows. street visible.
5th & 6th fl ref pa #2025-1126-0530 & 2025-1126-0534 : fire sprinkler ti. relocate 40, add 2 total 42
9th fl - bldg pa original 202504013519 as built to original adding additional 5 speaker strobe for 5 additional phone booths
(n) interior stair to connect (e) main & lower floor levels. redistribution of habitable rooms on both levels. dryrot repair, rebuild of main entry steps, waterproofing of lower level uphill retaining...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
scraping and painting emergency fire escape. no structural alteration.
re-roofing: roof replacement, no hot work.
re-roofing: roof replacement, install 3 ply system new roof, no hot work
8th fl -as-built for 202504033518 as built adding 5 additional speaker strobe per building ref# 202601063283
replace in kind rear yard siding, ~1000 sqft, and (6) rear windows same size / same location in kind.
addition of chainlink fencing with woven plastic slats, a rolling gate, an access gate to the adjacent property and associated footings.
to comply with nov# 202546484. legalize - build 2 concrete retaining walls 22' in lenght. build concreate stairs (11 risers). pour concrete in the rear yard slab on grade over 200 sq ft. repair fence...
t-mobile: install 6 new antennas 2 per sector. install 6 radios (3 x 3). add 2 cabinets. remove 1 cabinet.
revision to 202512161943, to correct the scope to include "seismic retrofit in accordance with 2022 cebc section a3 per engineered plan.
revision to pa# 202508213577: no skylight removal as it is a lightwell. lightwell to remain. (scope reduction)
repair dryrot (8' x 6') below front building window on left side.
to obtain final inspection for work approved under pa# 202409130764. all work is complete.
2 and 3 /fl- partial ti of (e) floor retail addition of (n) non structural, non rated drywall partition enclose ground (e) escalator from floor 2 -3 with drywall soffit extension under escalator for s...
fire repair 2 rear decks, replace sheet rock, 2 baths, 1 kitchen. address complaints 202535175