12th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking foun...
11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are incl...
obtain final inspection for work approved under pa# 201811065207, 201901170569, & 201907105473. all work is complete.
existing fire alarm system in an (e) residnetial building. new control panel & notification devices are being installed along with (e) initiation devices, in compliance with sffc 1103.7.6.1. installin...
1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes.
unit #6: convert (e) dining room to bedroom. rehabilitate (e) kitchen. add second bathroom. install washer and dryer.
14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be...
remodel e) facial room and mezzanine floor. construct (n) bathroom ground/f. construct (n) add shower at ground/f. construct (n) storage at mezzanine. construct 2 new facial rooms at g/f.
to obtain final inspection for work approved under pa # 202011058323. all work is complete.
recommencement and completion of work approved under pa # 202104017763, 202307242833.
1c hoffman ave: 1st floor powder room remodel, new plumbing and electrical 3rd floor: replace 84x120 balcony sliding door like for like, replace 84x60 sliding door like for like, replace 1 24x30 windo...
recommencement and completion of work approved under pa# 202302232527
replace (e) deck/landings and exterior stairs with (n) deck and rear yard access stairs including a pre-fabricated steel, spiral staircase, and construction of new, shallow isolated pad footings.
1st fl: add 1 home office, 1 full bath, family, and utility. 2nd fl: remodel kitchen and 1/2 bath. 3rd fl: remodel bath and add 1 full bath. replace interior stair.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
repair dryrot on elevator shaft and install new fire rated sheetrock on two walls. interior work
comply w/ nov #202315680- siding at front (west) & back (east) elevations has been replaced. opening at rear have been closed (4). new opening for door egress has been put in. new toilet.
submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan.
new 374sf studio converted into adu on g/f of (e) duplex - under state adu. legalize (e) kitchen and bathroom, no layout changes. no exterior changes.
submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan.