168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Establish a emergency transitional encampment with 32 shelter units per the land use code. Construct decks and install buildings accessory to emergency transitional encampment per…
Construct alterations to existing one family dwelling subject to field inspection (STFI).
Construct additions and alterations to one family dwelling per plan.
Construct exterior envelope repairs to existing multifamily building per plan.
Change of use from general retail sales and services to restaurant per land use code. Construct tenant improvement for a new coffee shop at main floor in Suite D of existing mixed…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Remove and install new 1/2"inch CDX plywood over entire roof. Included in proposalRemoval and disposal of 1 existing layer of old roofing material down to the plywood decking. Inst…
Construct interior alterations to existing one family dwelling subject to field inspection (STFI).
Construct alterations to one-family dwelling subject to field inspection (STFI)
Alterations to upper-level bathroom in a single-dwelling unit subject to field inspection.
Additions and alteration to a single family residence Subject to field inspection (STFI)
Demolish residential structure per plan
Construct interior alterations to existing Single family residence per STFI
We will be removing the current composition shingles. WE are going to install new 1/2" cdx plywood over the existing shiplap. We will then install new composition shingles.
Construct repairs to accessory structure roof per STFI
Alterations to existing house to repair water damage subject to field inspection (STFI).
Construct addition and alterations to institutional building (The Armory emergency generator vault and renewable energy improvements) per plan. Mechanical included.
We will be removing the current composition shingles. We will then plan to replace 44 sheets of the decking with new 1/2" cdx plywood. We will then install new composition shingles…
Construct blanket permit tenant improvements to Integrated Design Engineers on the 15th floor of existing commercial building per plan.
Establish use as rowhouse per land use code. Construct new townhouse building per plan.
Residential reroof only; no structural changes. Remove existing shingles. No planned plywood but if plywood is needed we will replace with 1/2" CDX. Install Owens Corning Duration…