168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Construct an industrial building (Boeing) occupy per plan. Mechanical is included.
soldier pile retaining wall and deck addition
Construct alterations to one-family dwelling subject to field inspection (STFI)
Construct interior alterations to existing single family residence per STFI
Earthquake retrofit plan set per SEHR
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Construct alterations for office café [RIPPLING CAFÉ] at 16th floor level of commercial office building [WEST 8TH] occupy per plan. [Work is related to Blanket permit #7125987-BK.]
Construct alterations to existing one family dwelling per plan.
Adhere new roofing membrane directly over the existing roof system
Construct tenant improvement office (Sandpoint) on 1st floor in north area of overall building in building 5B of existing warehouse building occupy per plan.
composite re-roof with re-sheet. The existing roof is on shiplap
Construct alterations to existing one family dwelling per plan.
Construct new south one-family dwelling per plan. (Establish use as single family residence with detached accessory dwelling unit per land use code. Construct two new one-family dw…
Construct new north one-family dwelling per plan. (Establish use as single family residence with detached accessory dwelling unit per land use code. Construct two new one-family dw…
Establish use as single family residence with attached accessory dwelling unit (AADU) and construct two family dwelling per plan
Demolish one-family dwelling & detached garage per plan
Installation of 50mil Duro-Last PVC membrane over one layer of existing smooth torch down roofing. No revisions to existing R-Value or replacement of roof sheathing.
Construct interior alterations to existing single family residence per STFI
Construct alterations to replace windows in-kind at one-family dwelling subject to field inspection (STFI)
ROOF PREPARATION (REMOVAL/TEAR OFF) Remove the existing shingles along with current roof system down to the decking 1 Full Roof Deck Replacement - Remove and install new 1/2"inch C…
Construct interior alterations to portions of 12th floor to create new elevator lobby per plan.