3,156 permits · NY · Staten Island
Filing herewith sprinkler over polymer storage tank area in main building. no change in use, egress, or occupancy.
Second Floor expansion to existing second floor area
Filed herewith for plumbing work fit out of existing restaurant space in conjunction to s01367349-i1. no change to use, occupancy, or egress under this application.
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
Resolve ecb violations: 39163098r, 39163099z, 39163101z and 39163218m; renovation of existing cellar and 1st floor with plumbing work: replace kitchen and bathroom fixtures as per plan; no change in u...
Installation of photovoltaic solar array on existing roof system as per plans.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Filing to obtain certificate of occupancy for existing 1-family building with interior renovations as required. in conjunction with alt-co #s01052476-i1. plumbing filed under s01052596-s1.
1) installation of gas furnace with split system dx coil for heating and cooling. 2) installation of split-system heat pump unit for heating and cooling of 3rd floor bedroom. 3) installation of exhaus...
ST. JOHN VILLA: Subsequent filing of Earthwork and Civil General Construction for site work preparation of a new school complex. JOB FILED IN CONJUCTION S01144839, S01149913, 500877063
Rerouting ductwork on second floor.
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
Subsequent filing for mechanical scope of work associated with the new building.
Rooftop solar installation. no change to use, occupancy or egress.
Installation of approximately +/- 389 lf of temporary sidewalk shed, as per plans, for public protection. no change in use, egress and occupancy.
Construct a two-family residence with built-in one car garage.
ShopRite: Replacing refrigerated cases with new in same locations. Installing a new fluid cooler on the roof. Providing new water and waste to new fluid cooler.
1)installation of gas furnace with split system dx coil for heating and cooling. 2)installation of split-system heat pump unit for heating and cooling of 3rd floor bedroom.3)installation of exhaust an...
Proposed 8' plywood construction fence, also applies to lot 45, (78 purdy ave)
Exterior storm piping
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com