168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Minor demolition with installation of new partitions on the 3rd and 4th floors (Piper Sandler) as per plans. No change to Use, Egress or Occupancy.
Interior demolition to exist. two family dwelling. demolition to include the removal ofnon-load bearing partitions and finishes. no change to egress, use or occupancy.
Full Demolition of One (1) Story Frame and Concrete Block Building
Hand Tool Demolition for a 1-story Brick & Stucco Building, and 2-story Brick Building
Interior renovation to ex. apartment 6c. demolish and construct non-structural partitions, doors, fixtures and finishes. no change to use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Scope of work includes the demolition and construction of a new storefront system and minor repairs and refinishing of existing facade elements. no change to use, occupancy or egre…
Demolition taking place on the 3rd floor per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of existing apartment including;demolition and renovation/enlargement of existing bathroom, including minor partition work, new doors, new wall & floor tile, ne…
Temporary bracing and partial demolition of 5 story building, as per plans filed herewith. This application is filed in conjunction with DOB#322109525.
This job is filed for construction fence for demolition work at 42-73 hunter street, queens, ny 11101.
This job is filed for construction fence for demolition work at 42-71 hunter street, queens, ny 11101.
Interior demolition of an existing office tenant space on the 2nd floor of an existing commercial and office building. selective removal of existing non-structural partitions, door…
Sprinkler head demolition and installation of temp sprinkler heads as per plans filed herewith. No change in use, egress, occupancy
Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 1st floor (Insta 360) as per plans. No change to use, egress or occupan…
Filing for legalization of interior demolition to commercial space.
Hereby filing for the interior demolition of two existing medical offices (units 1a and 1l) located on the first floor. no change to use occupancy or egress.
This is a full demolition, exempt from plan
Full demolition on existing 1-story detached garage in rear yard.
Full demolition to a two story house
Perform minor interior partition demolition & construction in conjunction w/apartment#2b cosmetic renovation. remove existing partition. install new track lighting. no change to us…